2024 PCPS Aquifer Storage & Recovery ASR Well BP-2
Sector: Water Supply and Storage • Location: Des Moines, Iowa, United States of America
Source: Dodge USA
The work includes, but is not necessarily limited to: 1. Construction of one aquifer storage and recovery system, including: a. Well pump. b. Control building. c. Interior process piping. d. Chemical feed systems. e. Electrical and control systems. 2. Installation of buried water main, storm water discharge piping,and sanitary sewer piping. 3. Completion of all required site work including grading
- Status
- Under Construction
- Sector
- Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Consumer Products, Government, Raw Materials, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Des Moines, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 PCPS Aquifer Storage & Recovery ASR Well BP-2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes, but is not necessarily limited to: 1. Construction of one aquifer storage and recovery system, including: a. Well pump. b. Control building. c. Interior process piping. d. Chemical feed systems. e. Electrical and control systems. 2. Installation of buried water main, storm water discharge piping,and sanitary sewer piping. 3. Completion of all required site work including grading, paving, and other items as detailed in the Contract Documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Consumer Products, Government, Raw Materials, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
