2024 Permanent Patch Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The saw cutting of the outline of the patch area, removing temporary patches and a portion of the base material, as necessary, or as ordered from prior utility cuts, compacting base material within the trench to the bottom elevation of the permanent A.C. patch, tacking the edges of the cuts, locating and raising of manholes, vaults, water or gas valves, and survey monuments, removal and reconstruc
- Status
- Closed
- Sector
- Automotive, Water Supply and Storage, Car parking, Commercial, Power Transmission, Road, Government, Power Generation (CCGT)
- Location
- Reno, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Permanent Patch Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The saw cutting of the outline of the patch area, removing temporary patches and a portion of the base material, as necessary, or as ordered from prior utility cuts, compacting base material within the trench to the bottom elevation of the permanent A.C. patch, tacking the edges of the cuts, locating and raising of manholes, vaults, water or gas valves, and survey monuments, removal and reconstruction of vehicle detection loops, placing and compacting A.C. pavement material within the limits ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Reno |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Car parking, Commercial, Power Transmission, Road, Government, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
