2024 Polk County Water Main Replacement - Contract 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work includes, but is not necessarily limited to: Provide materials, equipment, and labor necessary, including excavation, installation, backfill, testing, surface restoration in area of water main replacement and additional surface restoration in area of past water main breaks, cleanup, and miscellaneous associated work, to complete installation of approximately 350 feet of 8-inch ductile iro
- Status
- Closed
- Sector
- Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Manufacturing (Industrial), Commercial
- Location
- Des Moines, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Polk County Water Main Replacement - Contract 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes, but is not necessarily limited to: Provide materials, equipment, and labor necessary, including excavation, installation, backfill, testing, surface restoration in area of water main replacement and additional surface restoration in area of past water main breaks, cleanup, and miscellaneous associated work, to complete installation of approximately 350 feet of 8-inch ductile iron main and appurtenances, including abandonment of existing main in place, and construction of a ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
