2024 Resurfacing Project
Sector: Commercial • Location: Mount Pleasant, South Carolina, United States of America
Source: Dodge USA
This work shall include traffic control, milling, surface preparation, full depth patching, asphalt resurfacing, striping and associated appurtenances. The approximate length of the project is 1.5 miles. The total length of all paving will be approximately 2 miles. All procedures and specifications will follow SCDOT specifications. at Darrell Creek Trail and E hobcaw Drive
- Status
- Closed
- Sector
- Commercial, Government, Manufacturing (Industrial), Road
- Location
- Mount Pleasant, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Resurfacing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work shall include traffic control, milling, surface preparation, full depth patching, asphalt resurfacing, striping and associated appurtenances. The approximate length of the project is 1.5 miles. The total length of all paving will be approximately 2 miles. All procedures and specifications will follow SCDOT specifications. at Darrell Creek Trail and E hobcaw Drive |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Mount Pleasant |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Manufacturing (Industrial), Road |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
