2024 Road Improvement Project
Bid results · New Jersey · Last reported Jul 2025
Source: Dodge
SFY 2024 Road Improvement Project, N.10th Street, N. 13th Street and N. 15th St (From Barnegat Avenue to Westerly End.: The total project includes approximately 947 Tons of 9.5M64 HMA Top Course, 1208 Tons of 19M64 HMA Base Course, 6250 square yards of pavement removal, 6250 Square Yards of DGA, fourteen (14) drainage inlets, 300 LF of concrete curb, 740 LF of 8-inch drainage pipe, three (3) tide
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Cement, Government
- Location
- Beach Haven, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 Road Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SFY 2024 Road Improvement Project, N.10th Street, N. 13th Street and N. 15th St (From Barnegat Avenue to Westerly End.: The total project includes approximately 947 Tons of 9.5M64 HMA Top Course, 1208 Tons of 19M64 HMA Base Course, 6250 square yards of pavement removal, 6250 Square Yards of DGA, fourteen (14) drainage inlets, 300 LF of concrete curb, 740 LF of 8-inch drainage pipe, three (3) tide valves, one (1) sanitary manhole, 20 LF 8-inch sanitary sewer pipe and all restoration including ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Beach Haven |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
