2024 Route 1 - Crapaud
One of 4,618 projects Taiyo tracks in Prince Edward Island.
Source: Dodge USA
The work includes: Cold planing existing asphalt on Route 1 (50 mm), cold planing existing asphalt on Old Post Road (full depth, assumed 200 mm), earth excavation, placing select borrow (450-600 mm), placing granular A (300 mm), placing asphalt base A (2 x 60 mm), placing asphalt seal B (50 mm), landscaping and all other work necessary to complete the Contract.
- Status
- Closed
- Sector
- Road, Manufacturing (Industrial), Commercial
- Location
- Charlottetown, Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Route 1 - Crapaud
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes: Cold planing existing asphalt on Route 1 (50 mm), cold planing existing asphalt on Old Post Road (full depth, assumed 200 mm), earth excavation, placing select borrow (450-600 mm), placing granular A (300 mm), placing asphalt base A (2 x 60 mm), placing asphalt seal B (50 mm), landscaping and all other work necessary to complete the Contract. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
City | Charlottetown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
