logo
ProjectApproved

2024 RTEP Window 1 Transmission Project Modifications

Sector: Energy • Location: United States

Source: PJM Inside Lines

Scope modifications including installation of new 500 kV dead-end structures near Black Oak substation, cost correction for breaker replacement at Doubs substation, and cancellation of breaker replacements at Ox substation.

Status
Prospective
Sector
Energy
Location
United States of America
Updated
22 Jul 2026
Source
PJM Inside Lines

ConstructChat

Ask ConstructChat about 2024 RTEP Window 1 Transmission Project Modifications

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “2024 RTEP Window 1 Transmission Project Modifications” is an infrastructure initiative in the Energy sector, located in United States. Taiyo aggregates data on it from PJM Inside Lines.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope modifications including installation of new 500 kV dead-end structures near Black Oak substation, cost correction for breaker replacement at Doubs substation, and cancellation of breaker replacements at Ox substation.

Original sector

Energy

Location

Country

United States of America (USA)

Source

Source

PJM Inside Lines

URL

More Details

Record type

Project

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project