2024 Rural Paving Program
Sector: Water Supply and Storage • Location: Chatsworth, Ontario, Canada
Source: Dodge USA
he total 5.6 km of rural road paving (Walker Sideroad, Concession 8, 10 Sideroad, 30 Sideroad) includes approximately: 48,750 m2 pavement pulverization (hot mix asphalt and surface treat roadway surfaces) 8,150 t of Granular A 6,150 t of Hot Mix asphalt (HL4) 150m of culvert replacements (450 to 900 mm dia. HDPE; one 1630x1120 CSPA), including dewatering and environmental protection.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial
- Location
- Chatsworth, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Rural Paving Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he total 5.6 km of rural road paving (Walker Sideroad, Concession 8, 10 Sideroad, 30 Sideroad) includes approximately: 48,750 m2 pavement pulverization (hot mix asphalt and surface treat roadway surfaces) 8,150 t of Granular A 6,150 t of Hot Mix asphalt (HL4) 150m of culvert replacements (450 to 900 mm dia. HDPE; one 1630x1120 CSPA), including dewatering and environmental protection. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Chatsworth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
