2024 SACS Telecommunications Replacement
Sector: Broadband • Location: Orem, Utah, United States of America
Source: Dodge USA
This project will provide fiber-optic communication from Currant Creek Dam to Win Diversion along SACS. The work will be broken up into four sections. 1. Win Diversion to Rhodes Diversion (approx. 0.5 miles), 2. Rhodes Tunnel Outlet Portal to Vat Diversion (along the West Fork pipeline, approx. 4.5 miles), 3. Vat Tunnel (approx. 7.2 miles), and 4. Vat Tunnel Outlet Portal (Open Chanel One) to Curr
- Status
- Closed
- Sector
- Broadband, Hydro, Power Transmission, Telecommunications, Tunnel, Power Generation (CCGT), Government, Commercial, Water Supply and Storage
- Location
- Orem, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 SACS Telecommunications Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will provide fiber-optic communication from Currant Creek Dam to Win Diversion along SACS. The work will be broken up into four sections. 1. Win Diversion to Rhodes Diversion (approx. 0.5 miles), 2. Rhodes Tunnel Outlet Portal to Vat Diversion (along the West Fork pipeline, approx. 4.5 miles), 3. Vat Tunnel (approx. 7.2 miles), and 4. Vat Tunnel Outlet Portal (Open Chanel One) to Currant Creek Dam (approx. 4.75 miles). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Orem |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Hydro, Power Transmission, Telecommunications, Tunnel, Power Generation (CCGT), Government, Commercial, Water Supply and Storage |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
