logo
ProjectClosed

2024 Secondary Metering

One of 10,000+ projects Taiyo tracks in Utah.

Source: Dodge USA

The project consists of furnishing all labor and materials for the removal of the existing secondary connections and installing Owner-supplied boxes, and lids. The project will be installed within a one-year time period. The total number of meters is approximately 2,400, but will vary depending on bid prices. Also included in the project is excavation to fully expose the existing service lateral (

Status
Closed
Sector
Water Supply and Storage, Car parking, Automotive, Commercial, Waste Processing and Treatment
Location
Clearfield, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Secondary Metering

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Secondary Metering” is an infrastructure initiative in the Water Supply and Storage sector, located in Clearfield, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of furnishing all labor and materials for the removal of the existing secondary connections and installing Owner-supplied boxes, and lids. The project will be installed within a one-year time period. The total number of meters is approximately 2,400, but will vary depending on bid prices. Also included in the project is excavation to fully expose the existing service lateral (which may be the entire stretch between curb and sidewalk), the removal of the existing service, ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Clearfield

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Automotive, Commercial, Waste Processing and Treatment

Article published date

2024-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project