logo
ProjectBid Results

2024 Sewer Line

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

for the purpose of replacing a 10 inch sewer main. The Main is located on West 1st St. in Carrollton Mo. The Main is approximately 420 ft. and start at about 412 W. 1st and ends at 1st and Locust. After having inspected by means of a camera it was determined that the Main needs to be replaced by an independent contractor. The sewer main is a 10 inch clay tile line four (4) to fourteen (14) feet be

Status
Closed
Sector
Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial
Location
Carrollton, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Sewer Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Sewer Line” is an infrastructure initiative in the Water Supply and Storage sector, located in Carrollton, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

for the purpose of replacing a 10 inch sewer main. The Main is located on West 1st St. in Carrollton Mo. The Main is approximately 420 ft. and start at about 412 W. 1st and ends at 1st and Locust. After having inspected by means of a camera it was determined that the Main needs to be replaced by an independent contractor. The sewer main is a 10 inch clay tile line four (4) to fourteen (14) feet below street level. The line will be repaired by means of replacing everything from manhole to manh...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Carrollton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project