2024 Sewer Pipeline Rehabilitation
Sector: Water Supply and Storage • Location: Xenia, Ohio, United States of America
Source: Dodge USA
Bids are to be submitted on the following proposal: reconstruction of approximately 7,245 feet of existing sewer pipelines and conduits by installation of cured, resin-impregnated flexible tube; clean and camera sewer mains; and install pipe patches, all as directed by the City Engineer, and in accordance with the General Conditions, Specifications, and Drawings included in the bid packet. Bids ar
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Xenia, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Sewer Pipeline Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bids are to be submitted on the following proposal: reconstruction of approximately 7,245 feet of existing sewer pipelines and conduits by installation of cured, resin-impregnated flexible tube; clean and camera sewer mains; and install pipe patches, all as directed by the City Engineer, and in accordance with the General Conditions, Specifications, and Drawings included in the bid packet. Bids are to be submitted on a per unit basis and are to be for complete work (including all equipment, l... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Xenia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
