2024 Sidewalk Gap
Sector: Car parking • Location: Ann Arbor, Michigan, United States of America
Source: Dodge USA
Scope of work consists of 0.25 mi of new sidewalk, grading driveways, and restoration along stone school road, glendale circle, and fair street city of ann arbor engineering 2024 sidewalk gap project
- Status
- Closed
- Sector
- Car parking, Road, Automotive, Government, Commercial
- Location
- Ann Arbor, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Sidewalk Gap
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work consists of 0.25 mi of new sidewalk, grading driveways, and restoration along stone school road, glendale circle, and fair street city of ann arbor engineering 2024 sidewalk gap project |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Ann Arbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
