2024 Sidewalk Replacement
Sector: Cement • Location: Fort Macleod, Alberta, Canada
Source: Dodge USA
Supply, place, and broom finish concrete sidewalk at a minimum of 100mm, based on CSA standards. Concrete to be 35 MPa at 28 days, with a maximum slump of 75mm. Concrete curb and/or gutter to match existing, as per City of Lethbridge Dwg. STR 03. Removal of any surplus base material as required in order to achieve sufficient concrete depths. Supply, place, and compact crushed aggregate as required
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Supply, place, and broom finish concrete sidewalk at a minimum of 100mm, based on CSA standards. Concrete to be 35 MPa at 28 days, with a maximum slump of 75mm. Concrete curb and/or gutter to match existing, as per City of Lethbridge Dwg. STR 03. Removal of any surplus base material as required in order to achieve sufficient concrete depths. Supply, place, and compact crushed aggregate as required - minimum 25mm to a maximum of 75mm. Expansion joints to be installed as required. New sidewalk ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
