2024 Site Improvements
Sector: Commercial • Location: Coon Rapids, Iowa, United States of America
Source: Dodge USA
This project consists of the demolition of the existing playground and necessary utilities and installation of a new playground and associated site and grounds improvements. The work also includes erosion enhancements underneath the existing home bleachers and around the press box, parking lot removal and replacement, addition of stormwater infrastructure, sidewalk expansion and improved railing,
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Car parking, Power Transmission, Rail, Residential, Waste Processing and Treatment, Automotive, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Coon Rapids, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the demolition of the existing playground and necessary utilities and installation of a new playground and associated site and grounds improvements. The work also includes erosion enhancements underneath the existing home bleachers and around the press box, parking lot removal and replacement, addition of stormwater infrastructure, sidewalk expansion and improved railing, screened and secure outdoor storage area near the baseball field, and grading for a future conces... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Coon Rapids |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Car parking, Power Transmission, Rail, Residential, Waste Processing and Treatment, Automotive, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
