2024 SMT Spring Oak Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Partial depth reconstruction of Platte Drive from Horseshoe Trail to 90 south of Pawnee Drive, the spot replacement of concrete panels along Summer Hill Drive from Shepard Lane to Winter Park Drive and from Winter Park Drive to Natalie Drive, the spot replacement of concrete panels along Glenshire Drive from Elam Road to Quail Drive and full depth reclamation and rehabilitation along Horseshoe Tra
- Status
- Closed
- Sector
- Cement, Car parking, Road, Government, Automotive, Commercial
- Location
- Mesquite, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 SMT Spring Oak Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Partial depth reconstruction of Platte Drive from Horseshoe Trail to 90 south of Pawnee Drive, the spot replacement of concrete panels along Summer Hill Drive from Shepard Lane to Winter Park Drive and from Winter Park Drive to Natalie Drive, the spot replacement of concrete panels along Glenshire Drive from Elam Road to Quail Drive and full depth reclamation and rehabilitation along Horseshoe Trail from Pioneer Road to Platte Drive. The construction/reconstruction of driveways, sidewalks and... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Mesquite |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Automotive, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
