2024 South Forestview Area Improvements
Sector: Commercial • Location: Baxter, Minnesota, United States of America
Source: Dodge USA
Major quantities for the Work include: 4 ACRE Clearing and Grubbing 35,020 SQ YD Remove Bituminous Pavement 561 SQ YD Remove Concrete Pavement 24,700 CU YD Excavation Common (EV) 13,000 CU YD Common Embankment (CV) 8,200 CU YD Aggregate Base Class 5 8,280 TON Bituminous Mixture (Wear and Non-Wear) 550 SQ YD 6-Inch Concrete Driveway/Walk 8 EACH Install Lighting Unit 250 SQ FT Sign Type C (Includes
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Electric Vehicles (EVs), Road, Waste Processing and Treatment, Automotive, Government, Raw Materials, Power Generation (CCGT)
- Location
- Baxter, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 South Forestview Area Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major quantities for the Work include: 4 ACRE Clearing and Grubbing 35,020 SQ YD Remove Bituminous Pavement 561 SQ YD Remove Concrete Pavement 24,700 CU YD Excavation Common (EV) 13,000 CU YD Common Embankment (CV) 8,200 CU YD Aggregate Base Class 5 8,280 TON Bituminous Mixture (Wear and Non-Wear) 550 SQ YD 6-Inch Concrete Driveway/Walk 8 EACH Install Lighting Unit 250 SQ FT Sign Type C (Includes Post) 19,500 LIN FT 4-Inch to 8-Inch Paint 5,950 LIN FT 4-Inch Schedule 40 PVC Sewer Service Pipe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Baxter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Electric Vehicles (EVs), Road, Waste Processing and Treatment, Automotive, Government, Raw Materials, Power Generation (CCGT) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
