2024 Steel Gas Main Construction
Sector: Car parking • Location: Kingston, Ontario, Canada
Source: Dodge USA
The work includes approximately installation of new 4-inch and 2-inch gas main on Princess Street. Including the following: 335 metres of 4-inch PE pipe 200 metres of 2-inch PE pipe 75 metres of rock excavation 85 square metres of asphalt pavement 425 square metres of concrete sidewalk 20 metres of concrete curb
- Status
- Closed
- Sector
- Car parking, Steel, Cement, Road, Commercial, Chemical (Industrial), Automotive, Oil and Gas, Metal, Manufacturing (Industrial)
- Location
- Kingston, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Steel Gas Main Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes approximately installation of new 4-inch and 2-inch gas main on Princess Street. Including the following: 335 metres of 4-inch PE pipe 200 metres of 2-inch PE pipe 75 metres of rock excavation 85 square metres of asphalt pavement 425 square metres of concrete sidewalk 20 metres of concrete curb |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Kingston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Steel, Cement, Road, Commercial, Chemical (Industrial), Automotive, Oil and Gas, Metal, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
