logo
ProjectClosed

2024 Storage Building

One of 10,000+ projects Taiyo tracks in Washington.

Source: Dodge USA

2024 Storage Building The scope of work generally consists of furnishing all labor, materials, and equipment necessary for performing the following types of work : (i) Procure and erect a 120x60x17 pre-engineered steel building, including overhead and man doors, (ii) Construct foundation (iii) Site work for grading and gravelling area around the structure. (iv) utility extension of electrical serv

Status
Closed
Sector
Commercial, Government, Warehouse, Steel, Consumer Products, Power Generation (CCGT), Raw Materials, Power Transmission, Metal
Location
Moses Lake, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Storage Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Storage Building” is an infrastructure initiative in the Commercial sector, located in Moses Lake, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2024 Storage Building The scope of work generally consists of furnishing all labor, materials, and equipment necessary for performing the following types of work : (i) Procure and erect a 120x60x17 pre-engineered steel building, including overhead and man doors, (ii) Construct foundation (iii) Site work for grading and gravelling area around the structure. (iv) utility extension of electrical service, (v) permitting. All work shall be performed pursuant to (i) applicable laws, rules, regulati...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Moses Lake

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Government, Warehouse, Steel, Consumer Products, Power Generation (CCGT), Raw Materials, Power Transmission, Metal

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project