2024 Street and Utility Improvements
One of 10,000+ projects Taiyo tracks in Minnesota.
Source: Dodge USA
Major quantities for the work include: 13,200 sq yd remove bituminous pavement (p) 14,800 sq yd geotextile fabric, type 5 (non-woven) 11,800 cu yd excavation-common (ev) (p) 4,900 cu yd select granular embankment (cv) (p) 4,700 cu yd aggregate base (cv) class 5 (p) 210 sq yd type sp 9.5 wearing course mix (2,b)(spwea230b) (4") 2,400 ton type sp 12.5 non wear course mix (2,b) (spnwb230b) 1,500 ton
- Status
- Closed
- Sector
- Car parking, Electric Vehicles (EVs), Water Supply and Storage, Commercial, Power Transmission, Manufacturing (Industrial), Road, Waste Processing and Treatment, Consumer Products, Automotive, Government, Power Generation (CCGT)
- Location
- Morristown, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Street and Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major quantities for the work include: 13,200 sq yd remove bituminous pavement (p) 14,800 sq yd geotextile fabric, type 5 (non-woven) 11,800 cu yd excavation-common (ev) (p) 4,900 cu yd select granular embankment (cv) (p) 4,700 cu yd aggregate base (cv) class 5 (p) 210 sq yd type sp 9.5 wearing course mix (2,b)(spwea230b) (4") 2,400 ton type sp 12.5 non wear course mix (2,b) (spnwb230b) 1,500 ton type sp 9.5 wear course mix (3,c) (spwea340c) 6,500 lin ft 6" perf pvc pipe drain w/geotextile wr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Morristown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Electric Vehicles (EVs), Water Supply and Storage, Commercial, Power Transmission, Manufacturing (Industrial), Road, Waste Processing and Treatment, Consumer Products, Automotive, Government, Power Generation (CCGT) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
