2024 Structural Lining Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The 2024 Structural Lining Program involves cleaning and structural lining of approximately 4,880 lineal feet of 6" and 10" cast iron water mains in the Towns of Brighton, Pittsford and Irondequoit. The work also includes the installation of temporary bypass pipe, replacing or installing valves, hydrants and appurtenances.
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Rochester, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Structural Lining Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2024 Structural Lining Program involves cleaning and structural lining of approximately 4,880 lineal feet of 6" and 10" cast iron water mains in the Towns of Brighton, Pittsford and Irondequoit. The work also includes the installation of temporary bypass pipe, replacing or installing valves, hydrants and appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Rochester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
