2024 Three Culvert Replacements
Sector: Water Supply and Storage • Location: Clemmons, North Carolina, United States of America
Source: Dodge USA
This project will replace the existing 15 RCP pipe under North Lakeshore Drive with two 24 RCPs, replace the existing 24 RCPs at Bridle Path with 30 RCP, and replace the existing 30 RCP at Parkdale Drive with two 30 RCPs. Work will include the installation of approximately 350 linear feet of 24 and 30 pipes, upstream and downstream concrete headwalls and wingwalls, and water and sewer utility relo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will replace the existing 15 RCP pipe under North Lakeshore Drive with two 24 RCPs, replace the existing 24 RCPs at Bridle Path with 30 RCP, and replace the existing 30 RCP at Parkdale Drive with two 30 RCPs. Work will include the installation of approximately 350 linear feet of 24 and 30 pipes, upstream and downstream concrete headwalls and wingwalls, and water and sewer utility relocations to address conflicts. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
