2024 Tiburon Pipeline Replacement
Sector: Water Supply and Storage • Location: Tiburon, California, United States of America
Source: Dodge USA
This contract is for furnishing labor and equipment for the installation of3,490 linear feet of 8-inch, 6-inch, and 4-inch welded steel pipe with valves,fittings, pipe disinfection, and appurtenances.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Tiburon, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Tiburon Pipeline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract is for furnishing labor and equipment for the installation of3,490 linear feet of 8-inch, 6-inch, and 4-inch welded steel pipe with valves,fittings, pipe disinfection, and appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Tiburon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
