2024 Trail Maintenance
Sector: Car parking • Location: Ogden, Utah, United States of America
Source: Dodge USA
The project consists of Asphalt Surface Treatment/Trail maintenance of the trails outlined on the plans. This will include paving widths between 8 to 10 feet wide. Schedule A: Asphalt surface treatment on various trails in West Haven City. (See section 5 drawings). The Owner also reserves the right to extend the contract for multiple years for additional work based upon the contract documents for
- Status
- Closed
- Sector
- Car parking, Road, Mass Transit, Automotive, Rail, Government, Commercial, Manufacturing (Industrial)
- Location
- Ogden, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Trail Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of Asphalt Surface Treatment/Trail maintenance of the trails outlined on the plans. This will include paving widths between 8 to 10 feet wide. Schedule A: Asphalt surface treatment on various trails in West Haven City. (See section 5 drawings). The Owner also reserves the right to extend the contract for multiple years for additional work based upon the contract documents for trails and road maintenance. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Ogden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Mass Transit, Automotive, Rail, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
