2024 Utility and Street Construction
Sector: Water Supply and Storage • Location: Wrightstown, Wisconsin, United States of America
Source: Dodge USA
Project Description: The project includes the following in accordance with the plans and specifications. 1,600 LF of Roadway Construction 500 LF of 12-Inch Storm Sewer 135 LF of 71-Inch By 47-Inch Elliptical Culvert 800 LF of 8-Inch Sanitary Main 2,100 LF of 12-Inch Water Main 2 Wet Detention Ponds
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Road, Commercial
- Location
- Wrightstown, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Utility and Street Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: The project includes the following in accordance with the plans and specifications. 1,600 LF of Roadway Construction 500 LF of 12-Inch Storm Sewer 135 LF of 71-Inch By 47-Inch Elliptical Culvert 800 LF of 8-Inch Sanitary Main 2,100 LF of 12-Inch Water Main 2 Wet Detention Ponds |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Wrightstown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
