2024 Utility Improvements
Sector: Water Supply and Storage • Location: Wauwatosa, Wisconsin, United States of America
Source: Dodge USA
Under this proposal, the Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for sanitary and storm sewer construction, water main construction, trench restoration, pavement repair, asphalt pavement, concrete pavement and work incidental thereto. Approximate quantities on Center Street: -1000 ft of 24" PVC Water Main -400 ft of 30" RCP Storm -220
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Wauwatosa, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Under this proposal, the Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for sanitary and storm sewer construction, water main construction, trench restoration, pavement repair, asphalt pavement, concrete pavement and work incidental thereto. Approximate quantities on Center Street: -1000 ft of 24" PVC Water Main -400 ft of 30" RCP Storm -220 ft of 36" RCP Storm -400 ft of 42" RCP Storm -12 Sanitary lateral and water service replacements ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Wauwatosa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
