2024 Water Distribution Improvements Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project consists of constructing approximately 7,150 feet of water main replacement and appurtenances. Engineering services to replace approximately 7,500 linear feet of cast iron and copper water main installed in the late 1800s (and more recently) with a new 8-inch diameter ductile iron pipe along with appropriate appurtenances.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment, Steel
- Location
- Rutland, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Water Distribution Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of constructing approximately 7,150 feet of water main replacement and appurtenances. Engineering services to replace approximately 7,500 linear feet of cast iron and copper water main installed in the late 1800s (and more recently) with a new 8-inch diameter ductile iron pipe along with appropriate appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Rutland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment, Steel |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project