2024 Water Distribution System Improvement Program
One of 6,743 projects Taiyo tracks in Rhode Island.
Source: Dodge USA
2024 Water Distribution System Improvement Program, consisting of water main improvements and service line replacements in Bristol County, Rhode Island. Work will include the cement-mortar lining of 6300 feet of existing cast iron water mains, installation of approximately 800 feet of new polyethylene water mains, the replacement of 123 BCWA-owned water service connections and may include the repl
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Chemical (Industrial), Government, Steel, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Warren, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Water Distribution System Improvement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2024 Water Distribution System Improvement Program, consisting of water main improvements and service line replacements in Bristol County, Rhode Island. Work will include the cement-mortar lining of 6300 feet of existing cast iron water mains, installation of approximately 800 feet of new polyethylene water mains, the replacement of 123 BCWA-owned water service connections and may include the replacement of up to 50 privately-owned water services. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Warren |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Chemical (Industrial), Government, Steel, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
