2024 Water System Improvements
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge USA
The work will consist of WATER SYSTEM IMPROVEMENTS - 2024 STANDBY POWER including installation of One (1) Owner supplied "Fixed" 750 kW generator and One (1) Owner Supplied "Portable 275 kW generator, One (1) Owner supplied 1600 Amp Automatic Transfer Switch, Two (2) Owner supplied 800 Amp Automatic Transfer Switches, One (1) Owner Supplied 600 Amp Automatic Transfer Switch, Contractor supplied ES
- Status
- Prospective
- Sector
- Power Generation (CCGT), Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Calhoun, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work will consist of WATER SYSTEM IMPROVEMENTS - 2024 STANDBY POWER including installation of One (1) Owner supplied "Fixed" 750 kW generator and One (1) Owner Supplied "Portable 275 kW generator, One (1) Owner supplied 1600 Amp Automatic Transfer Switch, Two (2) Owner supplied 800 Amp Automatic Transfer Switches, One (1) Owner Supplied 600 Amp Automatic Transfer Switch, Contractor supplied ESL 3640 Generator Docking Station, Contractor supplied PVC conduit, Contractor supplied Rigid Cond... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Calhoun |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
