logo
ProjectClosed

2024 Water System Improvements

Sector: Water Supply and Storage • Location: Battle Mountain, Nevada, United States of America

Source: Dodge USA

Installing site piping including buried piping, motor-operated valves, fittings and two tie-ins to existing 6-inch PVC water main and rehab existing well flowmeter station; 2) Installing 12 x 24 booster pumping station building; 3) Installing booster pumping station including pumps, piping, fittings, valves, check valve, flow meter, etc.; 4) Installing two 15,500-gallon, poly water storage tanks;

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Government
Location
Battle Mountain, Nevada, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Water System Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Water System Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Battle Mountain, Nevada, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installing site piping including buried piping, motor-operated valves, fittings and two tie-ins to existing 6-inch PVC water main and rehab existing well flowmeter station; 2) Installing 12 x 24 booster pumping station building; 3) Installing booster pumping station including pumps, piping, fittings, valves, check valve, flow meter, etc.; 4) Installing two 15,500-gallon, poly water storage tanks; 5) Installing truck fill standpipe; 6) Installing electrical source power and building power, lig...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Battle Mountain

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Government

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project