2024 Water System Improvements
Sector: Power Generation (CCGT) • Location: Battle Mountain, Nevada, United States of America
Source: Dodge USA
Installing site piping including buried piping, motor-operated valves, fittings and two tie-ins to existing 6-inch PVC water main and rehab existing well flowmeter station; 2) Installing 12 x 24 booster pumping station building; 3) Installing booster pumping station including pumps, piping, fittings, valves, check valve, flow meter, etc.; 4) Installing two 15,500-gallon, poly water storage tanks;
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Battle Mountain, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installing site piping including buried piping, motor-operated valves, fittings and two tie-ins to existing 6-inch PVC water main and rehab existing well flowmeter station; 2) Installing 12 x 24 booster pumping station building; 3) Installing booster pumping station including pumps, piping, fittings, valves, check valve, flow meter, etc.; 4) Installing two 15,500-gallon, poly water storage tanks; 5) Installing truck fill standpipe; 6) Installing electrical source power and building power, lig... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Battle Mountain |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
