2024 Water System Rehabilitation
Sector: Water Supply and Storage • Location: Mount Holly Springs, Pennsylvania, United States of America
Source: Dodge
This project involves the installation of up to approximately 900-LF of 8 PVC and 900- LF of 2 HDPE watermain including 3,600-LF of 1 HDPE services, as well as the replacement of 650-LF of existing 8 asbestos coated water main with 8 PVC. The project shall also include the installation of new valves and connections to the existing mains and 28 services. The aforementioned work shall take place on
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government
- Location
- Mount Holly Springs, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 Water System Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the installation of up to approximately 900-LF of 8 PVC and 900- LF of 2 HDPE watermain including 3,600-LF of 1 HDPE services, as well as the replacement of 650-LF of existing 8 asbestos coated water main with 8 PVC. The project shall also include the installation of new valves and connections to the existing mains and 28 services. The aforementioned work shall take place on McLand Road, Sycamore Road, Pine Road (SR 3006) and associated unnamed cartways in South Middleto... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Mount Holly Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
