2024 Water System Upgrades Division D
Sector: Water Supply and Storage • Location: Mount Pleasant, Michigan, United States of America
Source: Dodge USA
The Contractor will perform potholing (via vacuum excavating) on both private and public side of the water service curb stop at a minimum distance of 18 inches from the curb stop. A total of 372 material verifications will be completed and documented for the Owner. Quantities may be increased or decreased at the discretion of the Owner or Engineer. Work will include traffic control, landscaping, g
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Cement, Waste Processing and Treatment, Road
- Location
- Mount Pleasant, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Water System Upgrades Division D
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor will perform potholing (via vacuum excavating) on both private and public side of the water service curb stop at a minimum distance of 18 inches from the curb stop. A total of 372 material verifications will be completed and documented for the Owner. Quantities may be increased or decreased at the discretion of the Owner or Engineer. Work will include traffic control, landscaping, grass, pavement, and /or concrete restoration where necessary. The anticipated depth of pipe is ap... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Mount Pleasant |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Cement, Waste Processing and Treatment, Road |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
