2024 Water Treatment Plant Improvement
Sector: Water Supply and Storage • Location: Stevens Point, Wisconsin, United States of America
Source: Dodge USA
The Whiting Water Utility, Whiting, Wisconsin, hereby gives notice that sealed lump sum Bids will be received for the general construction of three ion exchange vessels to replace failing, located at the treatment plant on Elm Street in the Village of Whiting, Wisconsin. Roof removal and replacement is required with this work. Chemical feed system and minor water treatment plant system replacement
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Stevens Point, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Water Treatment Plant Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Whiting Water Utility, Whiting, Wisconsin, hereby gives notice that sealed lump sum Bids will be received for the general construction of three ion exchange vessels to replace failing, located at the treatment plant on Elm Street in the Village of Whiting, Wisconsin. Roof removal and replacement is required with this work. Chemical feed system and minor water treatment plant system replacements and improvements are included in this project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Stevens Point |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
