2024 West Street Reconstruction
Sector: Commercial • Location: Beaver Dam, Wisconsin, United States of America
Source: Dodge USA
The work for which bids are asked includes the following estimated quantities: 750 LF of sanitary sewer and laterals (6" thru 12" PVC) as well as 490 LF of sanitary sewer cured in place pipe lining (10-inch diameter) along with associated sanitary sewer work; 1,375 L.F. of water main (4" thru 8" PVC) and services; 1,200 LF of storm sewer (12"-24" Class III-A) and associated storm structure work; 5
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Hydro
- Location
- Beaver Dam, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 West Street Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for which bids are asked includes the following estimated quantities: 750 LF of sanitary sewer and laterals (6" thru 12" PVC) as well as 490 LF of sanitary sewer cured in place pipe lining (10-inch diameter) along with associated sanitary sewer work; 1,375 L.F. of water main (4" thru 8" PVC) and services; 1,200 LF of storm sewer (12"-24" Class III-A) and associated storm structure work; 5,600 S.Y. aggregate base and geogrid installation; 2,300 S.Y. topsoil and sodding; 120 TON of asp... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Beaver Dam |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Hydro |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
