2024 Woodland Roadway Maintenance
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project consists of roadway maintenance to various streets including oil and chip seal coating, single storm structure modification and related binder course build up. All Manholes and Valve Boxes shall be covered, protected, marked, and located prior/after seal coat operations. A-1 SEAL COATING Contractor shall street sweep excess chips 7-14 days after operations.
- Status
- Closed
- Sector
- Oil and Gas, Road, Commercial, Government
- Location
- Woodland, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Woodland Roadway Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of roadway maintenance to various streets including oil and chip seal coating, single storm structure modification and related binder course build up. All Manholes and Valve Boxes shall be covered, protected, marked, and located prior/after seal coat operations. A-1 SEAL COATING Contractor shall street sweep excess chips 7-14 days after operations. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Woodland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Road, Commercial, Government |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in United States of America
- Elliott Avenue Sidewalk
- FY 2011 Environmental Studies Program
- Total Costs of Ownership of Future Light-Duty Vehicles
- Rice Creek Floodplain Restoration Project (Enbridge 2010 Oil Spill Kalamazoo River NRDAR)
- Cooperative Ecosystem Studies Unit, Great Rivers CESU
- BLM WY Burrowing Mammal Soils Study Focusing on WY Pocket Gopher (CESU)
- Fiscal Year (FY) 2016 Vehicle Technologies Multi-Topic Funding Opportunity Announcement
- Advanced Technology Solutions for Unconventional Oil and Gas Development
