2024/2025 Beach Re-nourishment Project
Sector: Commercial • Location: Oak Island, North Carolina, United States of America
Source: Dodge USA
The work consists of hopper dredging with placement and grading of up to 2,386,500 cubic yards of beach fill material on 47,100 linear feet of beach on Oak Island. The project will also include the installation of 1,800 linear feet of post and rope. Turtle trawling/relocation as well as beach tilling may also be required.
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Government
- Location
- Oak Island, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024/2025 Beach Re-nourishment Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of hopper dredging with placement and grading of up to 2,386,500 cubic yards of beach fill material on 47,100 linear feet of beach on Oak Island. The project will also include the installation of 1,800 linear feet of post and rope. Turtle trawling/relocation as well as beach tilling may also be required. |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Oak Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
