logo

2024/25 Raw Water - Treated Water Pipeline

Sector: Bridge • Location: Hemet, California, United States of America

Source: Dodge

Project
Closed

The scope of work generally consists of, but is not limited to the furnishing and installation of 8 , 10 and 12 water main, all appurateces and fittings, trenching, backfill, repaving, replacement of curb ramp, driveways and curb and gutter, breaking through the existing concrete channel, installing an overhead pipeline along the bridge over the channel, and all other work necessary for the comple

Status
Closed
Sector
Bridge, Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Commercial, Cement, Government
Location
Hemet, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2024/25 Raw Water - Treated Water Pipeline

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024/25 Raw Water - Treated Water Pipeline” is an infrastructure initiative in the Bridge sector, located in Hemet, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work generally consists of, but is not limited to the furnishing and installation of 8 , 10 and 12 water main, all appurateces and fittings, trenching, backfill, repaving, replacement of curb ramp, driveways and curb and gutter, breaking through the existing concrete channel, installing an overhead pipeline along the bridge over the channel, and all other work necessary for the completion of this project.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Hemet

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Commercial, Cement, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project