2025-099659 MP - 13213 STABLER DR - Mechanical Permit
Sector: Car parking • Location: Austin, Texas, United States of America
Source: City of Austin Open Data Portal
Dexter 3317 A Left New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio FFE: 682.11 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 28 Actual Bld height: 27-6 required parking: 2.
- Status
- Prospective
- Sector
- Car parking, Automotive, Residential
- Location
- Austin, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Austin Open Data Portal
ConstructChat
Ask ConstructChat about 2025-099659 MP - 13213 STABLER DR - Mechanical Permit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Dexter 3317 A Left New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio FFE: 682.11 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 28 Actual Bld height: 27-6 required parking: 2. |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | City of Austin Open Data Portal |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Residential |
Article published date | 2026-06-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
