2025-2026 Ashland Lead Service Line Replacement
Sector: Water Supply and Storage • Location: Ashland, Wisconsin, United States of America
Source: Dodge
The work will generally consist of 92 water services over a timeframe of two years. The average length of service to be replaced is 46 feet. The majority of 2025 work is planned along Ellis Ave and Willis Ave Terminus. 2026 work will consist of locations along 13th Ave E and Prentice Ave. There will be ongoing road construction at each location; coordination will be key to successfully performing
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work will generally consist of 92 water services over a timeframe of two years. The average length of service to be replaced is 46 feet. The majority of 2025 work is planned along Ellis Ave and Willis Ave Terminus. 2026 work will consist of locations along 13th Ave E and Prentice Ave. There will be ongoing road construction at each location; coordination will be key to successfully performing this work. Additional sites for LSL replacement will be scattered throughout the City of Ashland;... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
