2025-2026 Secondary Metering
Sector: Water Supply and Storage • Location: Clinton, Utah, United States of America
Source: Dodge
The project consists of furnishing all labor and materials for the removal of the existing secondary connections and installing Owner-supplied boxes, and lids. The project will be installed within a one-year time period. The total number of meters is approximately 2,500, but will vary depending on field conditions. Also included in the project is excavation to fully expose the existing service lat
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Waste Processing and Treatment, Automotive, Commercial
- Location
- Clinton, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025-2026 Secondary Metering
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of furnishing all labor and materials for the removal of the existing secondary connections and installing Owner-supplied boxes, and lids. The project will be installed within a one-year time period. The total number of meters is approximately 2,500, but will vary depending on field conditions. Also included in the project is excavation to fully expose the existing service lateral (which may be the entire stretch between curb and sidewalk), the removal of the existing ser... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Clinton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
