2025-26 Sewer Collection System Master Plan
Sector: Waste Processing and Treatment • Location: Hayward, California, United States of America
Source: Dodge
The preliminary Scope of Services provided below is intended to illustrate the desired project components. Consultants are encouraged to present innovative concepts to produce a complete project. In addition, tasks that the Consultant believes are necessary for the completion of the project should be included in the proposal. The City expects flow monitoring to be conducted during the 2025-26 wet
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
- Location
- Hayward, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025-26 Sewer Collection System Master Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The preliminary Scope of Services provided below is intended to illustrate the desired project components. Consultants are encouraged to present innovative concepts to produce a complete project. In addition, tasks that the Consultant believes are necessary for the completion of the project should be included in the proposal. The City expects flow monitoring to be conducted during the 2025-26 wet weather season, followed by completion of the hydraulic model and master plan in 2026. The prelim... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Hayward |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
