2025 50/50 Sidewalk Replacement Program
Sector: Road • Location: Franklin Park, Illinois, United States of America
Source: Dodge
PROJECT: 2025 50/50 SIDEWALK REPLACEMENT PROGRAM consists of the removal and replacement of 4,000 SF of concrete sidewalk, 100 LF of combination concrete curb and gutter, 150 SY of concrete and asphalt driveway aprons, placement of detectable/tactile warning surfaces, root pruning, and concrete/asphalt pavement repairs, placed on aggregate subgrades at locations designated by the Village. BID DEAD
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | PROJECT: 2025 50/50 SIDEWALK REPLACEMENT PROGRAM consists of the removal and replacement of 4,000 SF of concrete sidewalk, 100 LF of combination concrete curb and gutter, 150 SY of concrete and asphalt driveway aprons, placement of detectable/tactile warning surfaces, root pruning, and concrete/asphalt pavement repairs, placed on aggregate subgrades at locations designated by the Village. BID DEADLINE: 10:00AM LOCAL TIME, THURSDAY SEPTEMBER 18TH, 2025. NOTICE: Sealed proposals for the 2025 50... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
