2025 ADA Curb Ramps Improvements
Sector: Water Supply and Storage • Location: Santa Clara, California, United States of America
Source: Dodge
The Work shall consist of removing existing curb, gutter, and sidewalk, installing 50 curb ramps with raised truncated domes, and reconstruction of curb, gutter, and sidewalk at 23 intersections as shown on the Plans. Work also includes removal and replacement of existing striping/crosswalks, storm drain improvements, new striping, sign posts, and pavement markings
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Work shall consist of removing existing curb, gutter, and sidewalk, installing 50 curb ramps with raised truncated domes, and reconstruction of curb, gutter, and sidewalk at 23 intersections as shown on the Plans. Work also includes removal and replacement of existing striping/crosswalks, storm drain improvements, new striping, sign posts, and pavement markings |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
