2025 AG Building Construction
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge USA
Project consists of construction of a new steel pre-fabricated AG building, that includes site work, site utilities, site lighting, concrete paving, concrete foundations, and site restoration of areas disturbed by new building construction as well as other Work indicated in the Contract Documents.
- Status
- Under Construction
- Sector
- Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Metal, Education, Cement, Steel, Government
- Location
- Streator, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 AG Building Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of construction of a new steel pre-fabricated AG building, that includes site work, site utilities, site lighting, concrete paving, concrete foundations, and site restoration of areas disturbed by new building construction as well as other Work indicated in the Contract Documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Streator |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Metal, Education, Cement, Steel, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
