logo
ProjectClosed

2025 Airside Electrical Construction

One of 10,000+ projects Taiyo tracks in Minnesota.

Source: Dodge

This project provides for the upgrade of existing taxiway lights and airfield signs to LED type lighting, modifying locations of in-pavement lights on the 12L Deicing Pad to align with marked positions and establishes paved islands at the intersection of Taxiways A, B, C, & D and at Taxiways C, D, P, & Q which includes marking, taxiway edge lights and airfield signs. Approximate quantities of majo

Status
Closed
Sector
Aerospace & Defense, Government, Airport, Power Generation (CCGT), Road, Commercial
Location
Minneapolis, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Airside Electrical Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Airside Electrical Construction” is an infrastructure initiative in the Aerospace & Defense sector, located in Minneapolis, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project provides for the upgrade of existing taxiway lights and airfield signs to LED type lighting, modifying locations of in-pavement lights on the 12L Deicing Pad to align with marked positions and establishes paved islands at the intersection of Taxiways A, B, C, & D and at Taxiways C, D, P, & Q which includes marking, taxiway edge lights and airfield signs. Approximate quantities of major items of work are as follows: Item description Quantity Unit of Measure Mobilization 1 LS Airpo...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Minneapolis

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Government, Airport, Power Generation (CCGT), Road, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project