2025 Bituminous Overlay
Sector: Manufacturing (Industrial) • Location: Stillwater, Minnesota, United States of America
Source: Dodge
Major items of work include: 1 LS MOBILIZATION 1 LS TRAFFIC CONTROL 171 SY - MILL BITUMINOUS SURFACE 2 2218.54 TON TYPE SP 12.5 WEARING COURSE MIXTURE (2;B) 4122.22 SY FULL DEPTH RECLAMATION 687.04 CY SALVAGE AGGREGATE BASE 458.02 CY AGGREGATE CLASS 5 916.05 CY COMMON EXCAVATION 134.01 TON SHOULDER BASE AGGREGATE CLASS 5 520.66 GAL BITUMINOUS MATERIAL FOR TACK COAT 1 LS WEED SPRAYING 5 GAL WEED SP
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Government
- Location
- Stillwater, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Bituminous Overlay
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major items of work include: 1 LS MOBILIZATION 1 LS TRAFFIC CONTROL 171 SY - MILL BITUMINOUS SURFACE 2 2218.54 TON TYPE SP 12.5 WEARING COURSE MIXTURE (2;B) 4122.22 SY FULL DEPTH RECLAMATION 687.04 CY SALVAGE AGGREGATE BASE 458.02 CY AGGREGATE CLASS 5 916.05 CY COMMON EXCAVATION 134.01 TON SHOULDER BASE AGGREGATE CLASS 5 520.66 GAL BITUMINOUS MATERIAL FOR TACK COAT 1 LS WEED SPRAYING 5 GAL WEED SPRAYING MIXTURE 0.4 ACRE SEEDING 100 CUYD SHOULDERING TOPSOIL BORROW |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Stillwater |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
