2025 Bonner Springs Concrete Project
One of 10,000+ projects Taiyo tracks in Kansas.
Source: Dodge
This project consists of approximately 370 linear feet of curb and gutter removal and replacement, 1,870 square feet of sidewalk replacement, and 6,760 square feet of driveway approaches and apron reconstruction. All concrete work shall utilize KCMMB 4K concrete, except for three designated driveway approach and apron locations, which shall require KCMMB 4K concrete modified with a 24-hour high-ea
- Status
- Closed
- Sector
- Cement, Government, Road, Power Transmission, Power Generation (CCGT), Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Bonner Springs, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Bonner Springs Concrete Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of approximately 370 linear feet of curb and gutter removal and replacement, 1,870 square feet of sidewalk replacement, and 6,760 square feet of driveway approaches and apron reconstruction. All concrete work shall utilize KCMMB 4K concrete, except for three designated driveway approach and apron locations, which shall require KCMMB 4K concrete modified with a 24-hour high-early strength additive to allow reopening to traffic within 24 hours of placement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Bonner Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Road, Power Transmission, Power Generation (CCGT), Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
