logo
ProjectClosed

2025 Bridge, Box Culvert and Control Structure Repairs

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The work consists of repairs to specified box culverts and other structures including spall repairs, crack injection, cathodic protection pile jackets and other specified maintenance items.

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Road, Bridge, Waste Processing and Treatment
Location
Sanibel, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Bridge, Box Culvert and Control Structure Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Bridge, Box Culvert and Control Structure Repairs” is an infrastructure initiative in the Water Supply and Storage sector, located in Sanibel, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work consists of repairs to specified box culverts and other structures including spall repairs, crack injection, cathodic protection pile jackets and other specified maintenance items.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Sanibel

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Road, Bridge, Waste Processing and Treatment

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project