2025 Canal Release Points Assessment
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
This project will evaluate the Project 184 canal release points and provide a condition assessment report. This report will be used to categorize the release points system for future CIP projects. Canal release point assessments are planned to occur every 5 years to give an overall condition of the system, track changes, and to prioritize projects.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Placerville, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 Canal Release Points Assessment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project will evaluate the Project 184 canal release points and provide a condition assessment report. This report will be used to categorize the release points system for future CIP projects. Canal release point assessments are planned to occur every 5 years to give an overall condition of the system, track changes, and to prioritize projects. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Placerville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project